BACKGROUND

The property is a two-story mixed-use building that is part of Nike World Headquarters’ (WHQ) ‘west campus’ properties. This site was selected for energy efficiency renovations after Nike became the owner of the property in May 2013. Inefficient equipment and systems nearing end of life presented a major cost savings opportunity. The second floor office space of the building was also one of the first Nike campus locations to receive a significant Tenant Improvement (TI), increasing occupant density.  All furniture, fixtures, and lighting were replaced with a new design reflecting the culture and business needs of the teams located there.

More

SOLUTIONS

The following energy efficiency measures were completed at Nike World Headquarters:

  • HVAC RTU Replacement/Demand Control Ventilation: Over 840,000 kBtu estimated savings, equaling more than $16,000 annually.
  • Boiler Replacement: Over 900,000 kBtu estimated savings, equaling more than $9,000 annually.
  • HVAC measurement and control upgrade (pnuematic to direct digital control): Over 3.1 million kBtu estimated savings, equaling more than $40,000 annually.
More

OTHER BENEFITS

Following the energy efficiency renovations implemented at Nike World Headquarters, improvements were realized in occupant comfort, productivity, and space utilization/density. Additionally, Nike realized a significant reduction in maintenance labor costs. Finally, the facility's ENERGY STAR® score improved 30 points, achieving a score of 95 in November 2016.

More

Annual Energy Use

(Source EUI)
Baseline (2012)
176 kBtu/sq.ft.
Actual (2014)
99 kBtu/sq.ft.

Energy Savings:

44%

Annual Energy Cost

Baseline (2012)
$156,600
Actual (2014)
$83,500

Cost Savings:

$73,100

Sector Type

Commercial

Location

Beaverton, Oregon

Project Size

92,600 Square Feet

Open meeting room, Nike Miler building
Open meeting room, Nike Miler building

Main Reception, Nike Miler building with reclaimed wood
Main Reception, Nike Miler building with reclaimed wood

Main entrance, Nike Miler building
Main entrance, Nike Miler building

Rear of Nike Miler building, view of new HVAC Units